DOD-STD-35-71A(MI)
14 January 1983
CHAR
CODE
STANDARD
PARAGRAPH
2590 UNITS SHALL CONFORM TO CALIBRATION REQUIREMENTS AFTER TEST.
2592 THE CHANGE IN SWITCHING POINT SHALL BE NOT GREATER THAN
2592 DEGREE(S) CELSIUS.
2594 THE CHANGE IN SWITCHING POINT SHALL BE NOT GREATER THAN
2594 DEGREE(S) FAHRENHEIT.
IMMERSION. TESTING SHALL BE PERFORMED IN ACCORDANCE
4809
WITH THE BASE DOCUMENT, EXCEPT 4809.
IMMERSION. TESTING SHALL BE PERFORMED IN ACCORDANCE
4810
WITH METHOD 104 OF MILSTD202.
4811 TEST CONDITION LETTER 4811 SHALL APPLY.
4832
FINAL MEASUREMENT(S) SHALL BE MADE WITHIN 4812 HOUR(S)
AFTER FINAL CYCLE.
4814 MEASUREMENTS SHALL BE NOT MADE UNTIL 4814 HOUR(S) AFTER THE
FINAL CYCLEo
THE REQUIREMENT(S) SHALL BE IN
1380
INSULATION RESISTANCE.
ACCORDANCE WITH THE BASE DOCUMENT, EXCEPT 1380.
THE REQUIREMENT(S) SHALL BE AS
6359
INSULATION RESISTANCE.
FOLLOWS.
77
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business