DOD-STD-35-71A(MI)
14 January 1983
CHAR
STANDARD PARAGRAPH
CODE
ALL EXTERNAL MATERIALS SHALL BE NONNUTRIENT TO
FUNGUS.
4762
FUNGUS GROWTH OR SHALL BE SUITABLY TREATED TO RETARD FUNGUS
THERE SHALL BE NO EVIDENCE OF FUNGUS GROWTH ON THE
GROWTH.
EXTERNAL SURFACES.
2560 UNITS SHALL CONFORM TO CALIBRATION REQUIREMENTS AFTER TEST.
TESTING SHALL BE PERFORMED IN ACCORDANCE WITH THE
4754
FUNGUS.
BASE DOCUMENT, EXCEPT 4754.
TESTING SHALL BE PERFORMED IN ACCORDANCE WITH
FUNGUS.
4755
METHOD 508 OF MILSTD810.
4756 TEST PERIOD SHALL BE 4756 DAY(S).
TESTING SHALL BE PERFORMED IN ACCORDANCE WITH
FUNGUS.
2566
MIL-F-13927.
2568 CLASS 2568 SHALL APPLY.
2570 METHOD 2570 SHALL APPLY.
THE REQUIREMENT(S) SHALL BE IN ACCORDANCE
1800 FLAME RESPONSE.
WITH THE BASE DOCUMENT, EXCEPT 1800.
THE TIME REQUIRED FOR SWITCH OPERATION
FLAME RESPONSE.
1802
SHALL BE NOT GREATER THAN 1802 SECOND(S).
69
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business