DOD-STD-35-117(MI)
16 June 1978
CHAR
STANDARD PARAGRAPH
CODE
THE REQUIREMENT(S) SHALL BE IN ACCORDANCE WITH
EXPLOSION.
2022
THE BASE DOCUMENT, EXCEPT 2022.
THE REQUIREMENT(S) SHALL BE AS FOLLOWS:
2023 EXPLOSION.
2024 SWITCHES SHALL BE ELECTRICALLY AND MECHANICALLY
OPERATIVE AFTER TEST.
2026 THERE SHALL BE NO EXPLOSION WITHIN THE SWITCH OR CHAMBER.
TESTING SHALL BE PERFORMED IN ACCORDANCE
EXPLOSION.
2002
WITH THE BASE DOCUMENT, EXCEPT 2002.
TESTING SHALL BE PERFORMED IN ACCORDANCE
EXPLOSION.
2004
WITH MIL-STD-202, METHOD 109.
THE LOAD SHALL BE 2006 PERCENT OF THE RATED LOAD.
2006
2008 THE LOAD TYPE SHALL BE 2008.
2010 THE CHAMBER TEMPERATURE SHALL BE 2010 DEGREES CELSIUS.
2012 THE PLUS TEMPERATURE TOLERANCE SHALL BE 2012 DEGREES
CELSIUS.
2014 THE MINUS TEMPERATURE TOLERANCE SHALL BE 2014 DEGREES
CELSIUS.
TESTING SHALL BE PERFORMED IN ACCORDANCE WITH
2013 EXPLOSION.
MIL-STD-810, METHOD 511.
81
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business