DOD-STD-35-117(M1)
16 June 1978
CHAR
CODE STANDARD
PARAGRAPH
2044 THE SWITCH SHALL BE PRESSURIZED WITH SYSTEM PRESSURE.
2046 THE SWITCH SHALL BE UNPRESSURIZED.
THE REQUIREMENT(S) SHALL BE IN ACCORDANCE WITH
FUNGUS.
4760
THE BASE DOCUMENT, EXCEPT 4760.
ALL EXTERNAL MATERIALS SHALL BE NONNUTRIENT TO
FUNGUS.
4761
FUNGUS GROWTH OR SHALL BE SUITABLY TREATED TO RETARD FUNGUS
THE MANUFACTURER SHALL VERIFY BY CERTIFICATION
GROWTH.
THAT ALL EXTERNAL MATERIALS ARE FUNGUS RESISTANT OR SHALL
WHEN THE FUNGUS TEST IS
PERFORM THE FUNGUS TEST.
PERFORMED, THERE SHALL BE NO EVIDENCE OF FUNGUS GROWTH ON
THE EXTERNAL SURFACES.
ALL EXTERNAL MATERIALS SHALL BE NONNUTRIENT TO
FUNGUS.
4762
FUNGUS GROWTH OR SHALL BE SUITABLY TREATED TO RETARD FUNGUS
THERE SHALL BE NO EVIDENCE OF FUNGUS GROWTH ON
GROWTH.
THE EXTERNAL SURFACES.
2090 THERE SHALL BE NO CHANGE IN OPERATING CHARACTERISTICS.
TESTING SHALL BE PERFORMED IN ACCORDANCE WITH THE
4754 FUNGUS.
BASE DOCUMENT, EXCEPT 4754.
TESTING SHALL BE PERFORMED IN ACCORDANCE WITH
4755 FUNGUS.
METHOD 508 OF MIL-STD-810.
4756 TEST PERIOD SHALL BE 4756 DAY(S).
87
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business