DOD-STD-35-36B(MI)
20 February 1979
CHAR
CODE STANDARD PARAGRAPH
THE REQUIREMENT(S) SHALL BE IN ACCORDANCE WITH
2572
IMPULSE.
THE BASE DOCUMENT, EXCEPT 2572.
THE TOTAL LEAKAGE DURING THE ENTIRE TEST SHALL
2574
IMPULSE.
BE NOT GREATER THAN 2574 CUBIC CENTIMETERS.
3562
IMPULSE.
TESTING SHALL BE PERFORMED IN ACCORDANCE WITH THE
BASE DOCUMENT, EXCEPT 3562.
3564
IMPULSE. TESTING SHALL BE PERFORMED IN ACCORDANCE WITH
MIL-P-81716.
3565 THE TEST FITTING SHALL BE IN ACCORDANCE WITH 3565.
3566 THE TEST FITTING BOSS SHALL BE IN ACCORDANCE WITH 3566.
3568 NOMINAL TEST PRESSURE SHALL BE 3568 POUNDS PER SQUARE INCH.
3569 NOMINAL TEST PRESSURE SHALL BE 3569 KILOPASCALS.
3572 PEAK TEST PRESSURE SHALL BE 3572 POUNDS PER SQUARE INCH.
3573 PEAK TEST PRESSURE SHALL BE 3573 KILOPASCALS.
3574 IMPULSE PRESSURE RATE SHALL BE NOT LESS THAN 3574 CYCLES
PER MINUTE.
115
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business