DOD-STD-35-138(MI)
5 January 1979
CHAR
CODE
STANDARD
PARAGRAPH
PROCEDURE NUMBER IV SHALL APPLY.
6329
4751 CHAMBER PRESSURE SHALL BE 4751 TORR.
CHAMBER PRESSURE SHALL BE 4735 KILOPASCALS.
4735
4752 DURATION AT LOW PRESSURE SHALL BE 4752 MINUTE(S).
6330 GROSS LEAK TEST CONDITION LETTER 6330 SHALL APPLY.
6331 TEST CONDITION LETTER D SHALL APPLY.
4743 MOUNTING SHALL BE BY ANY SUITABLE METHOD.
TEST CONDITION LETTER E SHALL APPLY.
6332
6333 MOUNTING SHALL BE BY ANY SUITABLE METHOD.
THE REQUIREMENT(S) SHALL BE IN
1494 SHOCK, HIGH IMPACT.
ACCORDANCE WITH THE BASE DOCUMENT? EXCEPT 1494.
THERE SHALL BE NO EVIDENCE OF
SHOCK, HIGH IMPACT.
1495
PHYSICAL DAMAGE.
141
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business