DOD-STD-35-1OOA(MI)
12 August 1978
CHAR
CODE
STANDARD
PARAGRAPH
3939
SHUTTLING
WITH
GAS.
THE
REQUIREMENT(S)
SHALL
BE
AS
FOLLOWS:
2512
THE ALLOWABLE LEAKAGE SHALL
BE
NOT
GREATER
THAN
2512
CUBIC
CENTIMETER(S) PER MINUTE.
2514
THE ALLOWABLE
LEAKAGE SHALL
BE
NOT
GREATER
THAN
2514
CUBIC
CENTIMETER(S)
PER CYCLE.
2516
THE SHUTTLING PRESSURE SHALL
BE
NOT
GREATER
THAN
2516
POUNDS PER SQUARE INCH.
2518
THE SHUTTLING PRESSURE
SHALL
BE
NOT
GREATER
THAN
2518
KILOPASCAL(S).
2482
SHUTTLING WITH GAS.
TESTING SHALL
BE PERFORMED
IN
ACCORDANCE WITH THE
BASE DOCUMENT,
EXCEPT 2482.
2484
SHUTTLING WITH GAS.
TESTING
SHALL
BE
PERFORMED
IN
ACCORDANCE
WITH
MILV-5530.
241
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business